Dubai adds AED 56.5 billion of Al Maktoum airport contracts for a 2032 opening

Sheikh Hamdan bin Mohammed announced on 26 November 2026 the award of contracts worth about AED 56.5 billion for Al Maktoum International Airport, taking contracts awarded on the project to about AED 80 billion, with operations still planned for 2032. For a buyer in Dubai South the award puts a funded programme behind the airport that the district's prices already assume.

Map of the United Arab Emirates showing Dubai, Abu Dhabi and Ras Al Khaimah
Castilion Estates

Sheikh Hamdan bin Mohammed bin Rashid Al Maktoum, Crown Prince of Dubai and Chairman of The Executive Council, announced on 26 November 2026 the award of contracts worth approximately AED 56.5 billion for Al Maktoum International Airport, per the WAM release carried by Sharjah 24. The award takes contracts and packages granted on the project to approximately AED 80 billion, and Khaleej Times reported the same day that operations remain planned for 2032. For a buyer in Dubai South, the district whose prices already assume the airport, the award converts a plan into a funded construction programme with a date.

What the AED 56.5 billion buys

The release lists the packages. The West Terminal Building and Concourse 1 package covers basements, tunnels, access ramps, short term car parks, a Ground Transportation Centre, metro connections, landside bridges and the utility networks for electricity, water, telecommunications, sewerage and stormwater drainage. The Concourse 2 and 3 package covers the superstructure: main buildings, rotundas, steel bridges, long span roofs, façades, fit outs and mechanical and electrical installations. The Concourse 4 package covers the substructure and its connection to the main baggage handling system. An electrical package adds two primary 132/11 kV substations.

The earlier phase, per the same release, was worth around AED 23.815 billion and covered enabling works, substructure packages, the Automated People Mover and the baggage handling systems. Khaleej Times put contracts under execution at more than AED 13 billion on 26 November 2026 and said works in the Concourse 2 and 3 zones are nearing completion. MEED named contractors for earlier packages on 26 November 2026, but no contractor is named for the new awards in any of the three reports.

How far the site has progressed

The release gives progress in volumes. Excavation has exceeded 24.23 million cubic metres, backfilling has passed 5.2 million cubic metres and 7,635 piles have been installed. In the Concourse 2 and 3 substructure, more than 875,603 cubic metres of concrete have been poured and more than 226,270 tonnes of reinforcement steel installed. Approximately 14,000 personnel are working on the listed packages.

That figure sits beside a larger one. Paul Griffiths, chief executive of Dubai Airports, told reporters on 17 November 2026 that more than 100,000 workers were on the site, as reported by Gulf News. The release counts the personnel on its named packages and the chief executive counted the whole site; this article uses the release.

What the finished airport is meant to be

Sheikh Hamdan said, per Gulf News on 26 November 2026: "Upon completion of all its phases, Al Maktoum International Airport will have an annual capacity exceeding 260 million passengers." Khaleej Times described the full build as five parallel runways, two passenger terminals and seven concourses with more than 430 aircraft stands. MEED put the site at 70 square kilometres with cargo capacity of 12 million tonnes a year.

The Dubai Media Office release of 28 April 2024 set the budget at AED 128 billion and the first phase at 150 million passengers within ten years, and said housing demand for a million people in Dubai South would follow. Sheikh Ahmed bin Saeed Al Maktoum, Chairman of Dubai Aviation City Corporation, said on 26 November 2026, per Khaleej Times: "We are moving decisively ahead with Phase One in accordance with the approved programme."

Which communities sit next to it

Dubai South is the government led city around the airport. Within it, Emaar South is the Emaar golf community built around an 18 hole championship course, with Golf Acres and Golf Dale as current launches. We reported on 26 November 2026 on Al Ghurair's Tessera, 80 homes from AED 2.1 million due in late 2028.

The Executive Council approved on 10 November 2026 an AED 2 billion Metro extension of about 3 kilometres and two stations into the airport city for services in 2031, per the WAM release. Until the stations are mapped, no building in the district can claim walking distance to a train.

What it means for investors

First, the award changes the probability of the airport, not the price of a home. Gulf News reported on 18 October 2026, on Property Finder listing data, that asking rents for Dubai South villas fell 12.45% between the third quarters of 2025 and 2026. A buyer underwriting a Dubai South purchase on rent should use that figure, not a projected airport premium.

Second, the sequence matters. The first phase is due in 2032, the Metro extension in 2031, and most current launches in the district hand over in 2028 or 2029. An off plan buyer in Emaar South will own a completed home for three or four years before the first flight, and the letting case in those years rests on Expo City, Jebel Ali and the construction workforce.

Third, for a buyer paying in US dollars or from Latin America. The dirham is pegged at AED 3.6725 to the dollar, so an AED 2.1 million home is about USD 572,000 at the peg with no currency risk against the dollar. Freddie Mac's survey of 25 November 2026 put the US 30 year fixed rate at 7.21%, the reference a US buyer carries to any UAE bank offer. A US owner reports foreign property and accounts under US rules, and a Canadian owner files Form T1135 above the CAD 100,000 threshold for specified foreign property, per the CRA page dated 19 October 2026; confirm the position with an adviser. Our US investors page sets out the questions.

Fourth, financing. The Central Bank's Circular 31/2013 caps any off plan mortgage at 50% of value with a maximum term of 25 years, and a bank lends only on a project it has approved, so a non resident buying off plan in the district funds the construction instalments in cash and arranges the mortgage towards the completion payment. Our non resident mortgage page lists the documents and our off plan mortgage page explains the timing.

What to watch

The contractors and completion dates for the AED 56.5 billion packages, which the release does not give. The RTA's station map for the 2031 Metro extension. Property Finder's fourth quarter rent data for Dubai South, which will show whether the 12.45% fall in villa asking rents has stopped. And any published date for the move of airline operations from Dubai International, which The National reported on 10 November 2026 as planned between 2032 and 2035. Castilion Estates presents Golf Acres and Golf Dale at Emaar South and can confirm current prices and payment plans on request.

Questions and answers

What exactly was awarded on 26 November 2026?
Contracts worth approximately AED 56.5 billion for Al Maktoum International Airport, covering the West Terminal and Concourse 1 substructure and tunnels, the superstructure of Concourses 2 and 3, the substructure of Concourse 4, two 132/11 kV substations and the related utility networks, per the WAM release of 26 November 2026. The release names no contractors and gives no completion date for the packages.
When will Al Maktoum International Airport open?
Khaleej Times reported on 26 November 2026 that the airport remains on course to commence operations in 2032 under its master plan. The Dubai Media Office release of 28 April 2024 described a first phase for 150 million passengers within ten years and a full build of 260 million passengers a year. No source gives a date for the full build.
Which communities are closest to the new airport?
Dubai South is the government led city around Al Maktoum International, and Emaar South is the Emaar golf community within it, with Golf Acres and Golf Dale as current launches. Expo City Dubai sits on the Red Line's Route 2020, and the AED 2 billion Metro extension approved on 10 November 2026 will add about 3 kilometres and two stations into the airport city by 2031. Station locations have not been published.
Can a non resident finance a home in Dubai South?
Yes, subject to the bank's criteria. The Central Bank's Circular 31/2013 caps any off plan mortgage at 50% of value with a maximum term of 25 years, and banks lend only on projects they have approved. For a completed home, lenders that serve non residents typically finance 50% to 65% of value; our non resident mortgage page lists the documents and the pre approval timing.

Sources

  1. WAM release of 26 November 2026, carried in full by Sharjah 24, on the award of contracts worth approximately AED 56.5 billion for Al Maktoum International Airport, the total of approximately AED 80 billion, the earlier AED 23.815 billion phase, the scope of each package, the two 132/11 kV substations, the excavation, piling and concrete figures and the workforce of approximately 14,000 (opens in a new tab). WAM, carried by Sharjah 24. Accessed .
  2. Khaleej Times report of 26 November 2026 on the AED 56.5 billion award, the more than AED 80 billion total, more than AED 13 billion of contracts under execution, works nearing completion in the Concourse 2 and 3 zones, the 2032 operations date, five runways, two terminals, seven concourses, more than 430 stands and the Sheikh Ahmed bin Saeed statement (opens in a new tab). Khaleej Times. Accessed .
  3. Gulf News report of 26 November 2026 on the AED 56.5 billion award, the total above AED 80 billion, the 14,000 strong team and the Sheikh Hamdan statement on capacity exceeding 260 million passengers once all phases are complete (opens in a new tab). Gulf News. Accessed .
  4. MEED report of 26 November 2026 on the awards as packages under the first phase of the USD 35 billion expansion, the 70 square kilometre site, five runways, 430 gates, 12 million tonnes of cargo a year, the April 2024 master plan approval and the contractors named for earlier packages (opens in a new tab). MEED. Accessed .
  5. Government of Dubai Media Office release of 28 April 2024 on the approval of the AED 128 billion passenger terminal, 260 million passengers a year at full build, a first phase for 150 million passengers within ten years, five parallel runways, 400 gates, 70 square kilometres, 12 million tonnes of cargo and housing demand for a million people (opens in a new tab). Government of Dubai Media Office. Accessed .
  6. Gulf News report of 17 November 2026 on Paul Griffiths' remarks that more than 100,000 workers were on the Al Maktoum site and that the first phase is due in 2032 (opens in a new tab). Gulf News. Accessed .
  7. WAM release of 10 November 2026, carried by The Gulf Time, on the AED 2 billion Metro extension of about 3 kilometres and two stations into Al Maktoum International Airport City for 2031 (opens in a new tab). WAM, carried by The Gulf Time. Accessed .
  8. Gulf News report of 18 October 2026 on Property Finder listing data, with Dubai South villa asking rents down 12.45% between the third quarters of 2025 and 2026 (opens in a new tab). Gulf News. Accessed .
  9. The National on the Metro extension approval and the plan to move commercial operations from Dubai International to Al Maktoum International between 2032 and 2035, 10 November 2026 (opens in a new tab). The National. Accessed .
  10. Freddie Mac Primary Mortgage Market Survey, US 30 year fixed rate of 7.21% and 15 year rate of 6.54% as of 25 November 2026, down from 7.28% and 6.66% the week before (opens in a new tab). Freddie Mac via GlobeNewswire. Accessed .
  11. Canada Revenue Agency, Form T1135 Foreign Income Verification Statement, filing threshold of CAD 100,000 of specified foreign property and the personal use property exclusion, page dated 19 October 2026 (opens in a new tab). Canada Revenue Agency. Accessed .
  12. Central Bank of the UAE Regulations Regarding Mortgage Loans, Circular 31/2013, Article 3, loan to value limits of 80% for an expatriate's first home below AED 5 million, 60% on an investment property and 50% off plan, maximum term 25 years (opens in a new tab). Central Bank of the UAE. Accessed .

Where Castilion can help

Weighing a decision this touches?

Our licensed team can talk it through with you, in confidence and without obligation.

Talk to an Advisor
A Castilion Estates advisor seated in a Dubai office, ready to take an enquiry
Castilion Estates advisory teamCastilion Realty L.L.C. · RERA ORN 46392

Talk to an Advisor

Let’s find the right property for you.

Tell us what you’re looking for. A Castilion Estates advisor will help you explore opportunities that match your goals.

Talk to an Advisor

An advisor replies within one business day. No obligation, and your details are used only to answer your enquiry.

WhatsApp an advisor